We’ve worked on a lot of great projects over the years. Here’s a selection of some of our more recent ones.

Multi-Family

Developer: Polyhomes

Beaufort Landing Phase 2 & 3 (2018-2020)
2&3 Bedroom Executive townhome project.                                                    Excavation, Slab preparation and foundation drainage                                                                                                                                                            
Townsend(2018-Present)
177 -unit townhouse project
foundation drainage, slab preparation and landscape grading

Developer: Dawson + Sawyer

Sunnyside (2012)

20-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation

Cambridge Park (2013)
56-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation
Semiahmoo Trail (2014)
32-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation
On the Course 1 (2014)

26-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation
On the Course 2 (2015)
32-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation
Fleetwood Mac (2015)
58-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation
Guildford 3 (2018)
38-unit townhouse project
Building trunk lines, foundation drainage and slab preparation
Eagles (2018)
98-unit townhouse project building trunk lines, foundation drainage and slab preparation

 

Developer: Fairborne Homes Ltd.

Sequoia (2011-2012)
91-unit townhouse site
Clearing, site excavation, site preparation, foundation drainage and slab preparation
Ashbury Hill (2012)

64-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation

Silverwood (2012)

72-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation

Eton (2012)

55-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation

 

Developer: GrayRose Developments

The Grove (2013)
20-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation
Cambridge Walk (2014)

12-unit live-work townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation

Developer: RDG Management Group

Wexley (2016-2017)

91-unit townhouse project
Clearing, site excavation, site preparation, foundation drainage and slab preparation

Single-Family Residential

 

Developer: Cantera Management Group

Residential Subdivide – Walnut Grove (2013)

Two-home subdivision
Site preparation, foundation drainage/slab preparation

Single-Family Homes – Fort Langley (2015)
Three-lot subdivision in the heart of Fort Langley
Clearing, basement foundation over excavation, foundation drainage, slab preparation
Single-Family Home – Morgan Creek (2016)
Private residence in the heart of Morgan Creek
Foundation drainage, gas line trenching, slab preparation, rough lot grading

Special Projects

Residential Home Add-On – Langley (2015)
Private residence
Demolition of existing garage between two homes, excavation for foundation install.
Swimming Pool – South Surrey (2016)
Private residence
Pool excavation, removal of material, backfill and regrade of yard ready for landscaping.
Swimming Pool – Langley (2017)

Private residence
Pool excavation, removal of material, backfill and regrade of yard ready for landscaping.

Outdoor Living Addition – Langley (2016)
Private residence
Excavation for outdoor living area slab and pergola. Electrical and drainage piping installed and backfilled ready for slab pour.
Guy Garage – Surrey
Private residence
Foundation pad prep, foundation drainage, rock retaining wall, flat forming and driveway design.
Guy Garage – Walnut Grove
Private residence
Installation of underground services and retaining wall construction.
Outdoor Riding Ring – South Langley
Private residence
Rebuild of horse paddocks as well as stadium-size riding ring construction.
Driveway Removal, Redesign – Walnut Grove

Private residence
Redesign of client’s driveway with installation of new retaining wall and re-landscape

Footer

Dyna Contracting

7684 232 Street
Langley, BC V1M 3S1

604-371-4399

info@dynacontracting.ca

  • Facebook
  • Instagram

Connect With Us!

  • This field is for validation purposes and should be left unchanged.

Our Company

  • About
  • Services
  • Projects
    • Multi-Family
    • Single-Family
    • Special Projects
  • Fleet
  • Testimonials

Copyright © 2025 | Dyna Contracting | Langley Web Design by Original Ginger | Site Terms

Return to top of page